The Exploratorium’s new home has an ace up its sleeve for the next big earthquake—a single seismic joint, 300 feet long and two feet wide, will isolate the entire pier structure from the rest of San Francisco. Watch here as the bulkhead at Pier 15 is readied for the installation of the seismic joint.
The Exploratorium moved to Pier 15 on the Embarcadero, which runs along the city's historic eastern waterfront. With three times the space, the Exploratorium has expanded its exhibit experience, both inside and outdoors, and has enhanced access to new learning opportunities. This location also offers greater visitor access from around the Bay and beyond.
Visit our Press Site for news and updates, or see architectural images and a reprise of groundbreaking events.
Visit our Press Site for news and updates, or see architectural images and a reprise of groundbreaking events.
Visit the Exploratorium at the Piers Website
Featured
| 00:05:21 | Exploratorium at Pier 15: Green Machine (Clip) 2/6/2013 Catch a sneak peak of our new nine-acre campus at Piers 15/17 with Building Operations Man ... |
| 00:04:17 | A Joint Effort (Clip) 11/20/2012 The Exploratorium’s new home has an ace up its sleeve for the next big earthquake—a s ... |
| 00:04:56 | Palace of Fine Arts at Pier 15 (Clip) 8/10/2011 Weaving our present location with our future location. ... |
| 00:01:51 | Pier 15 Construction Timelapse (Clip) 6/17/2011 Construction of Pier 15 from March 11th through May 27th of 2011. Images courtesy of Nibbi Co ... |
| 00:01:33 | Observatory Construction Timelapse (Clip) 6/17/2011 Construction of the Observatory at Piers 15 & 17 from April 12th through April 27th of 2011. ... |
Recent
| 00:00:29 | The Fog Bridge at the Exploratorium (Clip) 6/3/2013 Fog Bridge #72494 | Artist: Fujiko Nakaya | April 17 through September 16, 2013 | ... |
| 00:01:38 | Building the Exploratorium at Pier 15: Timelapse (Clip) 2/7/2013 Watch the Exploratorium's construction process from December 2010 to November 2012 in under tw ... |
| 00:05:21 | Exploratorium at Pier 15: Green Machine (Clip) 2/6/2013 Catch a sneak peak of our new nine-acre campus at Piers 15/17 with Building Operations Man ... |
| 00:04:17 | A Joint Effort (Clip) 11/20/2012 The Exploratorium’s new home has an ace up its sleeve for the next big earthquake—a s ... |
| 00:01:53 | The Fries Bridge is Installed (Clip) 1/5/2012 The waters of San Francisco Bay are making a dramatic comeback as workers slowly remove ... |