During the construction of the Exploratorium's location at Piers 15 and 17, pouring concrete was an ongoing feature. This footage, captured in July 2011, shows the well-choreographed process involved, from pumping the concrete into rebar-latticed slabs via remote-controlled overhead boom, to vibrating the concrete to get rid of air pockets, to flattening the surface using 2x4s (“screed”) and rakes (“come-along tools”), to tamping in (“jitterbugging”) bits of sand and gravel, to the final smoothing and leveling of the finished surface. This pour created an extension to the southeast apron of Pier 15, adjacent to what will become the East Gallery.